
ACCEPTED
• Furniture and household clean-out items
• Packaging and light, non-hazardous general rubbish
NOT ACCEPTED IN THIS STREAM
• Soil, bricks, tiles and concrete
• Asbestos, chemicals, liquids, batteries and gas bottles
Ask first about mattresses, tyres, electrical items and whitegoods. Separate arrangements or extra charges may apply. Keep the load below the rim.

ACCEPTED
• Grass clippings and leaves
• Prunings and garden branches within the agreed size limits
NOT ACCEPTED IN THIS STREAM
• Plastic bags, packaging and general rubbish
• Soil, building rubble and treated timber
Tell us about stumps, large trunks and palm material before booking so the processor can confirm acceptance.
ACCEPTED
• Clean soil in a dedicated soil bin, after its source and condition are confirmed
NOT ACCEPTED IN THIS STREAM
• Contaminated or suspect soil booked as clean fill
• Asbestos, rubbish, green waste and mixed building debris
Soil commonly uses 2–6m³ skips. Declare rocks, turf or rubble. We confirm the permissible fill level for the material and truck.
ACCEPTED
• Clean bricks, tiles and concrete in the agreed masonry recycling stream
NOT ACCEPTED IN THIS STREAM
• Timber, plasterboard, plastic and general rubbish
• Soil, asbestos and liquid waste
Tell us about reinforcing steel, coatings and mixed rubble before ordering. Keep materials separate to support specialised recycling.
ACCEPTED
• Clean wooden pallets and untreated timber, subject to the recycling specification
NOT ACCEPTED IN THIS STREAM
• General rubbish, masonry, soil and liquids
• Chemically contaminated timber
Painted, treated and engineered timber need assessment before loading. RORO bins suit bulk pallet collections; we confirm access and loading conditions.
ACCEPTED AFTER ASSESSMENT
• Selected dry residual materials that meet the receiving processor’s specification
NOT ACCEPTED WITHOUT SPECIFIC APPROVAL
• Wet or putrescible waste
• Hazardous materials, asbestos, chemicals and liquids
• Loads that do not meet the agreed specification
PEF means processed engineered fuel. It is energy recovery after reuse and recycling options are considered. Send material details for assessment before loading.
ACCEPTED
• Non-hazardous building and renovation waste in the agreed mixed construction stream
• Timber offcuts, packaging and masonry where included in your quote
NOT ACCEPTED
• Asbestos or suspected asbestos-containing material
• Chemicals, liquids, gas bottles and batteries
• Contaminated soil or undeclared hazardous waste
Tell us the mix before ordering. Dedicated clean masonry or timber loads may use a separate recycling stream. Heavy loads need an agreed weight and fill limit.
ACCEPTED
• Clean, non-hazardous scrap metal in a dedicated metal collection
NOT ACCEPTED
• Gas bottles, batteries and pressurised containers
• Liquids, contaminated drums and general rubbish
Tell us about appliances, tanks, machinery and large or heavy pieces before loading. We confirm preparation, acceptance and lifting requirements.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.